|
PILOT STATION : 35-01-40 n, 128-46-55 E |
|
Facilities for General
Cargo Terminals |
|
|
|
Length (M) |
Depth (M) |
Berthing
Capacity |
Annual cargo- handling Capacity |
Main Cargo |
Tonnage |
No.of vessels |
|
|
No.1 Pier |
292 |
7.5 |
8,000 |
2 |
682,000 |
S.SCRAP,LOGS, ORE |
|
Central Pier |
- |
- |
Small Ship |
|
80,000 |
G.CARGO |
|
No.2 Pier |
385 |
- |
1,000 |
3 |
368,000 |
|
|
No.3 Pier |
420 |
10.2 |
20,000 |
2 |
956,000 |
STEEL, PRODUCTS FROZEN FISH GENERAL CARGO |
|
No.4 Pier |
1,050 |
10.3 |
20,000 |
5 |
- |
CONTAINER,CARS |
|
No.5 Pier |
420 |
10.5 |
20,000 |
2 |
956,000 |
S.SCRAP, LOGS |
|
Western Pier |
821 |
7.5 |
20,000 |
3 |
1,433,000 |
LOGS, FROZEN FISH |
|
Korea Heavy Industries &
Construction Pier |
240 |
|
20,000 |
1 |
1,080,000 |
MACHINERY |
|
|
|
|
Length (M) |
Berthing Capacity (Tonnage) |
No.of vessels |
Main Cargo |
|
|
SK Pier |
292 |
3,000 |
1 |
OIL |
|
Hoyu Pier |
105 |
6,000 |
1 |
OIL |
|
Hanil Pier |
80 |
3,000 |
1 |
AN |
|
Ssangyong Dolphin |
88 |
5,000 |
1 |
Cement |
|
|
|
|
Length (M) |
Berthing
Capacity |
Annual cargo- handling Capacity |
Main Cargo |
Tonnage |
No.of vessels |
|
|
No.1 Pier |
558 |
20,000 1,000 |
1 4 |
611,000 |
Fertilizer Soybean |
|
No.2 Pier |
325 |
20,000 1,000 |
1 1 |
380,000 |
Grains Sand |
|
|
|